Inside The HS2 Bromford Tunnel

WATER ORTON, ENGLAND - SEPTEMBER 17: An aerial view shows the construction at the Bromford HS2 tunnel site on September 17, 2024 in Water Orton, England. The construction of the Bromford tunnel, HS2's gateway to Birmingham, has reached the halfway point with the 1,600 tonne TBM, named 'Mary Ann' excavating 1.75 miles of the first bore of the 3.5 mile tunnel. (Photo by Christopher Furlong/Getty Images)
WATER ORTON, ENGLAND - SEPTEMBER 17: An aerial view shows the construction at the Bromford HS2 tunnel site on September 17, 2024 in Water Orton, England. The construction of the Bromford tunnel, HS2's gateway to Birmingham, has reached the halfway point with the 1,600 tonne TBM, named 'Mary Ann' excavating 1.75 miles of the first bore of the 3.5 mile tunnel. (Photo by Christopher Furlong/Getty Images)
Inside The HS2 Bromford Tunnel
購買授權
我可如何使用此圖片?
HK$2,250.00
HKD
Getty ImagesInside The HS2 Bromford Tunnel, News PhotoInside The HS2 Bromford Tunnel, News PhotoInside The HS2 Bromford Tunnel Get premium, high resolution news photos at Getty ImagesProduct #:2172630536
HK$3,500HK$1,000
Getty Images
In stock

詳情

限制條件:
關於所有商業或推廣用途,請聯絡您當地辦公室的業務代表。
來源:
編輯性內容編號:
2172630536
圖像集:
Getty Images News
建立日期:
2024年09月17日
上傳日期:
授權類型:
發佈資訊:
無許可授權 更多資料
來源:
Getty Images Europe
物件名稱:
dji_20240917143343_0037_d_nwfbfhby
最大檔案大小:
8064 x 4536 像素 (68.28 x 38.40 cm) - 300 dpi - 23 MB