Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted. A special truck platform is used for the work. Kleppe bypass, Stavanger, Rog

Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted A special truck platform is used for the work Kleppe bypass, Stavanger, Rogaland, Norway. (Photo by Adrian Greeman/Construction Photography/Avalon/Getty Images)
Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted A special truck platform is used for the work Kleppe bypass, Stavanger, Rogaland, Norway. (Photo by Adrian Greeman/Construction Photography/Avalon/Getty Images)
Novapoint project for bypass - cable runs in the lighting system for the tunnel (550m) can be installed with more confidence because clashes will have already have been spotted. A special truck platform is used for the work. Kleppe bypass, Stavanger, Rog
購買授權
我可如何使用此圖片?
HK$2,250.00
HKD
請注意:呈現歷史事件的圖片可能包含不反映現今理解的主題或描述。它們以歷史背景提供。了解更多

詳情

限制條件:
關於所有商業或推廣用途,請聯絡您當地辦公室的業務代表。
來源:
編輯性內容編號:
976620194
圖像集:
Hulton Archive
建立日期:
2008年03月13日
上傳日期:
授權類型:
發佈資訊:
無許可授權 更多資料
來源:
Hulton Archive
物件名稱:
zb5350_241317_0704.jpg
最大檔案大小:
4085 x 4278 像素 (34.59 x 36.22 cm) - 300 dpi - 6 MB